Table 2: European Bank for Reconstruction and Development: eligibility criteria for small hydro power projects
Field |
Eligibility criteria |
Descriptor |
Evidence |
Regulatory compliance |
The facility complies with the requirements of national environment, health and safety law |
The facility, or proposed facility, has all the necessary permissions and permits required under national law |
The developer has undertaken an Environmental Impact Assessment where required by national authorities and that EIA has been disclosed to the public in accordance with national requirements; The developer has obtained the required licences and permits to build and operate the facility. |
Water flow |
The facility maintains a minimum flow in the river that is adequate for the existing fish population, wildlife and water quality taking into account seasonal fluctuations in flow levels |
Maintain a minimum wetted channel perimeter, at all control structures, with a constant flow in the river throughout the year; Facility viability to be based on minimum flow required for river to sustain existing environment |
Justification must be provided in the light of the requirement to provide an adequate flow for fish, wildlife and water quality |
Water quality |
The facility does not contribute to deterioration of water quality either upstream or downstream of the facility |
Minimal impact on water quality in the head pond, bypassed reach and the reaches downstream of the tailrace and diversion dams |
The facility has not contributed to a deterioration of water quality post construction |
Fish passage and protection |
The facility had minimal impact on local fish populations, provides effective fish passage for local and migrating fish species and also protects fish from entrainment |
There should be minimal loss of fish or fish habitat; Facility preserves resident fish communities; Facility preserves ability of fish to move and migrate; Flows in the bypassed reach and downstream of the tailrace are adequate to support aquatic and riparian species at pre-facility ranges |
Information has been gathered on both the local and migrating fish populations; The developer understands the particular structure and needs of the fish within the area of the facility; The developer has provided adequate mitigation measures to ensure that the eligibility criteria are met. |
Watershed protection |
The facility does not negatively impact environmental conditions in the watershed |
The facility does not affect the integrity of the existing ecosystem either upstream or downstream of the facility; Additional components of the facility e.g. access roads, power lines, and generation facilities have minimal impact on the riparian environment |
An assessment of impacts associated with additional components has been made; An assessment of upstream and downstream impacts has been made; Adequate mitigation measures have been provided to ensure the eligibility criteria are met |
Threatened & Endangered Species Protection |
The facility does not negatively impact any threatened or endangered species nor any areas designated for their protection |
The facility is not constructed on a protected or sensitive river; The facility does not threaten or harm the habitat or migration patterns of endangered species, threatened species or species of regional concern; The facility has no significant impact on existing wildlife habitat and populations |
Sensitive or protected areas on or around the river have been identified; Endangered or threatened species present in the area of, or downstream from, the facility have been identified; The developer has assessed the potential impact of the facility on any such areas or species; The developer has provided adequate mitigation measures to ensure that the eligibility criteria are met |
Recreation |
The facility does not stop or limit recreational uses of the river |
Access to the water remains unchanged by the facility and accommodates recreational activities on the river |
Identification of any current recreational uses of the river around the site of the facility and confirmation that these will not be affected by the development of the facility |
Cultural issues |
The facility does not inappropriately impact cultural property |
Cultural property includes sites having archaeological (prehistoric), paleontological, historic, religious and unique natural values; Cultural property therefore includes remains left by previous human inhabitants and unique natural features such as canyons and waterfalls |
Cultural property in the vicinity of the facility has been identified; Adequate mitigation measures have been put in place to ensure eligibility criteria are met |
Community issues |
The facility does not reduce local community use of either the river or the surrounding lands |
The facility does not stop or limit local communities’ ability to utilise the river to provide a livelihood, i.e. by fishing, as a leisure amenity or to utilise the land around the river where they may rely on the river for irrigation purposes |
Local community uses of the river have been identified; The locally affected community has been notified and consulted prior to the development of the facility; Adequate mitigation measures have been agreed to ensure that eligibility criteria are met; Such mitigations measures might include providing access to power particularly in situations where local power supply is inadequate |
Source: Information from the European Bank for Reconstruction and Development