The Eswatini Electricity Company (EEC) has enlisted the expertise of Studio Pietrangeli for Technical Assistance Advisory Consultancy Services in the development and construction of the Maguga Hydropower Projects. This initiative encompasses the expansion of the Maguga Hydropower Project (HPP) by 30MW, the establishment of the new Lower Maguga Scheme generating 23MW, and the implementation of a new Mini-Hydro project with a capacity of 1.2MW.
The Maguga Hydropower Expansion Project is slated to involve the construction of a reinforced concrete surface powerhouse. This facility will be outfitted with cutting-edge generating equipment, a dewatering bay, and essential associated infrastructure. Plans also include extending the existing switchyard and installing a new transformer to enhance the overall efficiency of the power generation process.
The Lower Maguduza Hydro Power Station (LMHPS) is strategically positioned along the Lusutfu River near Sidvokodvo. The commencement of construction is expected in the first quarter of 2024, with the inaugural unit from the plant anticipated to be commissioned by the last quarter of 2026. The construction scope of LMHPS encompasses a diversion weir, a 2km 66kV transmission line, a foot bridge spanning the dam, and upgrades to the substation.