TENAGA NASIONAL BHD (TNB) is conducting a feasibility study on the joint development of a pumped storage power plant in Pahang, Malaysia with Tokyo Electric Power Company of Japan.
According to TNB sources, power from a coal-fired power station would be used during off peak periods in the night to pump water to the upper reservoir. The study is expected to be completed at the end of this year.
• If you would like to update the data on your pumped storage plant in IWP&DC’s Yearbook 2002, please contact Tracey Kennett on fax: +44 208 269 7804. Alternatively, email tkennett@wilmington.co.uk.