Under the contract, Eaton will design and engineer control and distribution systems, and install motor control centers, low-voltage switchboards and arc resistant low-voltage switchgear, with an expected completion date of 30 October 2010.
Hartwell Dam was built by USACE between 1955 and 1962 to improve flood control, generate hydroelectric power and promote navigation along the Savannah River.