Brazilian contractor Construtora Triunfo is relying on a complete line of crushing, screening, recovery and ore storage equipment from Metso for the two dams on the Jordão river. Located in the counties of Candói, Pinhão and Foz do Jordão (PR), the projects will have a combined generating installed capacity of 238MW, serving around 2.5M consumers.

The Metso equipment is installed on the Santa Clara Watershed Management job site and will have its production directed to other Triunfo projects as soon as the two dams are completed.