Concrete mixing technology worth over US$20M will be provided for the project, which involves the construction of a 140m RCC dam that will require 4.5Mm3 of cooled concrete.

Four Betomix 4.5 B-R/DW concrete mixing plants will ensure a minimum output of 720m3 an hour for the Son La project. Suitable temporary material stores, conveying equipment, control systems, moisture measurement systems and refrigerator systems will also be supplied.


Related Articles
Spotlight on… Vietnam