The works include a 22m high dam, water intake, 2220m long headrace tunnel, other civil works for a penstock, the power house building and its associated works.

CONTACT: Eng José Freire de Carvalho, Hidroerg – Projectos Energéticos, Lda, Rua dos Lusíadas, n.º 9-4º, Dto, P-1300-365 Lisboa. Tel: 213610810. Fax 213627500. Email: hidroerg@mail.telepac.pt.