SMEC’s services will include: preparation of a prefeasibility study, a feasibility study, plant designs and hydrological studies to assess potential river flow. The objective of the studies is to identify the best location for the hydroelectric plant.
SMEC to work on Indonesian hydro project
Indonesian contractor PT Duta Graha Indah Tbk has awarded Australia-based SMEC a contract to provide consultancy services for the 5.5MW Batang Gadis hydroelectric project on the Batang Gadis River in Mandailing Natal, North Sumatra, Indonesia.