Table 1

1 January 2000


Table 1: Summary of Project Details
ITEM DESCRIPTION
Project Owner / Client BC Hydro
Water Source: Bull River
Catchment Area at Intakes 1528.5km2
Mean Annual Flow at Intakes 31.85m3/sec (20.83 l/s/km2)
Maximum Design Flow 38.5m3/sec
Gross Head 83.9m
Project Operation Run-of-River
Maximum Power Capacity 25MW
Instream Flow Requirements (IFR’s) 0.25m3/sec December to March, 0.5m3/sec April, May, October and November, 2m3/sec June to September
Capacity Factor 48%
Average Annual Energy 105GWh
Intakes Existing intakes in Aberfeldie Dam, one originally in service, one blanked off, modified to produce two identical intakes of 19.25m3/sec capacity.
Waterway Low Pressure Conduit (LPC) ~850 m buried 3.35m (132”) dia. Weholite HDPE plus ~150m surface-mounted 2.9m (114”) dia. steel pipes; Steel surge tank 15m high 13m dia. at junction of the LPC and HPP; 150m long 2.74m (108”) dia. steel High Pressure Penstock (HPP) down cliff face immediately behind powerhouse.
Turbines 3 x 8.33MW horizontal axis Francis
Generators 13.8kV direct-coupled synchronous
Powerhouse Concrete substructure, steel superstructure
Switchyard At powerhouse, step-up 13.8 to 69kV
Transmission Line: None – direct connection to grid at switchyard
Design Earthquake: BC Building Code - 1:2,500 event



Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.