Table 1

1 January 2000


Table 1. Structure of dam surveillance system in Switzerland
Level Responsibility Activities Reports
1 Owner (dam safety engineer, technical staff) Regular inspection of condition (by visual observations) and behaviour (by measurements). Tests of spillway and bottom outlet gates. Monitoring records and test protocols
2 Experienced engineer (civil engineer) Analysis of the measured data and observations. Annual inspection of the dam. Yearly report on condition and on measured behaviour.
3 Experts (civil engineer and geologist) Inspection and appraisal of the dam safety every five years. Report on condition and long-term behaviour. Analysis of special safety related questions.
4 Dam Safety Authority On-site inspection. Review of the annual reports and the expert’s appraisal. Verification of the implementation of the necessary measures. Interventions if measures have to be implemented.



Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.