Table 2

1 January 2000


Table 2: Details of two main smaller project excavations
Project Dalvatn Slettedalselva
Contractor Veidekke ASA Kruse Smith A/S
Headrace tunnel length inc. pipe trench (m) 1300 (new) 3660
- section (m2) 14.5-25 (depending on alternative) 18.5
Tailrace tunnel length (m) 280 490
- section (m2) 25 18.5
Access tunnels length (m) 310 + 350 615
- section (m2) 30 + 22 31
Transfer tunnels length (m) 1150 + 2910 + 16,270 0
- sections (m2) 22 + 10 +9.6 0
Intake shaft length (m) 880 0
Power station cavern volume (m3) 13,500 6000
Surge shaft length (m) 190 280
- section (m2) 4-52 6.5



Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.