SMEC will investigate raising the full supply level of the reservoir via installation of gates on the free-overflow spillway, without affecting the safety of the dam.
Sans Souci Dam was commissioned in 1984 and was designed and supervised by SMEC. The rockfill dam with a central clay core is 35m high, has a crest length of 350m and a 30MW power station.