Case study: Rehabilitating the asphalt lining of the reservoir at La Muella II, Spain
ByIn 2013, WALO was contracted to carry out some partial rehabilitation of an asphalt lining of a reservoir at the largest pump storage plant in Spain.
The rehabilitation was carried out as part of the capacity increase of the entire hydro power scheme and the power plant remained operational throughout the works.
Please download this free white paper for more information.