Obras Subterraneas
Subscribed
You have successfully submitted your enquiry. Someone from our company will respond ASAP
Obras Subterraneas
Address
Press Releases
Design and Execution of the Està Tunnel Repair Work in (Panama)
On 7 June, 2012 Panama’s Està hydroelectric power station resumed operations after nearly 2 years out of service due to the problems detected in the load tunnel of the facility. Following the repair work carried out by the company Obras Subterráneas on the above-mentioned tunnel, owners AES Panamá now benefit from a greater generation capacity, as the load loss in the tunnel has decreased by 30%.